San Juan, January 24 (RHC)-- Puerto Rico’s governor says he’s moving to privatize the Puerto Rico Electric Power Authority, known as PREPA. The electrical authority faced widespread criticism after Hurricane Maria destroyed the island’s power grid, and PREPA’s then-director signed a $300 million contract with a tiny Montana company linked to Interior Secretary Ryan Zinke.
Many activists have warned politicians would use Hurricane Maria to privatize the power authority, which is now the largest public power utility in the United States.
Puerto Rico Governor Moves to Privatize Island’s Public Power Authority After Maria
Articles en relation
Commentaires
Laissez un commentaire
Tous les champs sont requisPlus de visites
- Cuba montre des signes de reprise, malgré la guerre économique menée par les États-Unis
- Le Venezuela condamne la déclaration du Haut-Commissaire aux droits de l'homme
- États-Unis : d'anciens fonctionnaires demandent à M. Biden de modifier sa politique à l'égard de Cuba
- Cuba va introduire des modifications dans le système de change
- Les députés cubains se préparent pour la nouvelle session du Parlement